Activity / PermitFee 

Residential Electrical 

$60.00

Commercial / Industrial Electrical (effective 01-04-2016):

     Branch circuits and feeders,          each $2.00
     New Service:
               1 to 100 ampere,    $25
           101 to 200 ampere,     $25
           201 to 400 ampere,     $65
           401 to 600 ampere,   $105
           601 to 800 ampere,   $145
           801 to 1000 ampere, $185
           Services larger than 1000 ampere:
              first 1000 ampere $185, each
              additional 100 ampere $20
    Pre-connect,                                 each $25
    Multiple pre-connects at same building:
          1 to 10, $25 each; each additional $10
    Temporary pole/service                 each $25
    Outage                                         each $25
    Low voltage                                  each $25
    Administrative fee                          $25

       

 

Plumbing 

$40.00

Mechanical 

$40.00

Re-inspection

$40.00

Re-Roof (Ice & Water Shield inspection) Installation

$100.00

Lawn Sprinkler Backflow Inspection

$40.00

Sign

$50.00

Above Ground Swimming Pool
In Ground Swimming Pool

$50.00
$150.00

Arterial Street Improvement Program (ASIP)

1.83% of bldg. valuation

HOUSE \ BUILDING MOVING:

1. House Movers License (to be paid by a licensed house mover showing proof of insurance coverage)
2. House Moving Permit (from outside Douglas County to inside Douglas County
)
3. House Moving Permit (from a location inside Douglas County to another location inside Douglas County)
4. Type B Moving Permit (a building less than 400 square feet, or less than 12 feet wide, or less than 12 feet in height)



$25.00

$100.00

Bldg. permit fee

$50

OTHER:

  1. Required fees shall be doubled if construction has commenced prior to obtaining required permits.

  2. If construction has begun after a permit is issued, the full fee is forfeited. If construction has not started and a request is made to withdraw a permit, a 25% cancellation fee will be assessed.

 


Rate per square foot is used to determine total structure valuation.  

Residential 

$75.00 / sq. ft. 

Attached / Detached Frame Garage 

$18.00 / sq. ft.

Attached / Detached Block Garage

$21.00 / sq. ft.



Valuation and Permit Fee:

Total Valuation Permit Fee 

$1.00 to $500.00

$24.00 

$501.00 to $2,000.00

$24.00 for the first $500.00; plus $3.00 for each additional $100.00 or fraction thereof, to and including $2,000.00 

$2,001.00 to $40,000.00

$69.00 for the first $2,000.00; plus $11.00 for each additional $1,000.00 or fraction thereof, to and including
$40,000.00 

$40,001.00 to $100,000.00

$487.00 for the first $40,000; plus $9.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00 

$101,001.00 to $500,000.00

$1,027 for the first $100,000.00; plus $7.00 for each additional $1,000.00 or fraction thereof, to and including
$500,000.00 

$500,001.00 to $1,000,000.00

$3,827.00 for the first $500,000.00; plus $5.00 for each additional $1,000.00 or fraction thereof, to and including
$1,000,000.00

$1,000,001.00 to $5,000,000.00

$6,327.00 for the first $1,000,000.00 plus $3.00 for each additional $1,000.00 thereof, to and including $5,000,000.00 

$5,000,001.00 and over

$18,327.00 for the first $5,000.000.00 plus $1.00 for each additional $1,000.00 or fraction thereof 

Appendix L, Permit Fees, 2006 International Residential Code



LATEST NEWS

  • Mon Apr 01 2019
    Be Water Wise!

    SPRING is here!             There are several springtime lawn and garden activities that Douglas County...

    Read More ...

Get Adobe Reader

Douglas County Video Tour