• SKIP NAVIGATION

Background Image Background Image Background Image Background Image Background Image Background Image Background Image

 

Activity / PermitFee 

Residential Electrical 

$60.00

Commercial / Industrial Electrical (effective 01-04-2016):

     Branch circuits and feeders,          each $2.00
     New Service:
               1 to 100 ampere,    $25
           101 to 200 ampere,     $25
           201 to 400 ampere,     $65
           401 to 600 ampere,   $105
           601 to 800 ampere,   $145
           801 to 1000 ampere, $185
           Services larger than 1000 ampere:
              first 1000 ampere $185, each
              additional 100 ampere $20
    Pre-connect,                                 each $25
    Multiple pre-connects at same building:
          1 to 10, $25 each; each additional $10
    Temporary pole/service                 each $25
    Outage                                         each $25
    Low voltage                                  each $25
    Administrative fee                          $25

       

 

Plumbing 

$40.00

Mechanical 

$40.00

Re-inspection

$40.00

Re-Roof (Ice & Water Shield inspection) Installation

$100.00

Lawn Sprinkler Backflow Inspection

$40.00

Sign

$50.00

Above Ground Swimming Pool
In Ground Swimming Pool

$50.00
$150.00

Arterial Street Improvement Program (ASIP)

1.83% of bldg. valuation

HOUSE \ BUILDING MOVING:

1. House Movers License (to be paid by a licensed house mover showing proof of insurance coverage)
2. House Moving Permit (from outside Douglas County to inside Douglas County
)
3. House Moving Permit (from a location inside Douglas County to another location inside Douglas County)
4. Type B Moving Permit (a building less than 400 square feet, or less than 12 feet wide, or less than 12 feet in height)



$25.00

$100.00

Bldg. permit fee

$50

OTHER:

  1. Required fees shall be doubled if construction has commenced prior to obtaining required permits.

  2. If construction has begun after a permit is issued, the full fee is forfeited. If construction has not started and a request is made to withdraw a permit, a 25% cancellation fee will be assessed.

 


Rate per square foot is used to determine total structure valuation.  

Residential 

$75.00 / sq. ft. 

Attached / Detached Frame Garage 

$18.00 / sq. ft.

Attached / Detached Block Garage

$21.00 / sq. ft.



Valuation and Permit Fee:

Total Valuation Permit Fee 

$1.00 to $500.00

$24.00 

$501.00 to $2,000.00

$24.00 for the first $500.00; plus $3.00 for each additional $100.00 or fraction thereof, to and including $2,000.00 

$2,001.00 to $40,000.00

$69.00 for the first $2,000.00; plus $11.00 for each additional $1,000.00 or fraction thereof, to and including
$40,000.00 

$40,001.00 to $100,000.00

$487.00 for the first $40,000; plus $9.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00 

$101,001.00 to $500,000.00

$1,027 for the first $100,000.00; plus $7.00 for each additional $1,000.00 or fraction thereof, to and including
$500,000.00 

$500,001.00 to $1,000,000.00

$3,827.00 for the first $500,000.00; plus $5.00 for each additional $1,000.00 or fraction thereof, to and including
$1,000,000.00

$1,000,001.00 to $5,000,000.00

$6,327.00 for the first $1,000,000.00 plus $3.00 for each additional $1,000.00 thereof, to and including $5,000,000.00 

$5,000,001.00 and over

$18,327.00 for the first $5,000.000.00 plus $1.00 for each additional $1,000.00 or fraction thereof 

Appendix L, Permit Fees, 2006 International Residential Code



LATEST NEWS

Get Adobe Reader

Douglas County Video Tour